During the summer half term, ULCCO SP was the main contractor on the refurbishment of part of the Sir Alistair Pilkington Building.

 

The works comprised of refurbishing 5 floors of the existing building to provide new facilities for the School of the Arts which involved asbestos removal, internal demolitions and structural alterations, new internal walls to provide the new layout along with extensive mechanical and electrical service alterations and the installation of a new passenger lift.

Externally, new roof coverings were installed along with a new entrance and accessible ramp, steps and handrailing with refurbishment of the existing sliding sash windows.

The internals were completed with new WC facilities, kitchen, joinery, decoration and floor finishes with a new main entrance and new furniture provided direct by the university.

The works were completed for the new semester intake of September 2021.